Florida Division of Forestry
Silviculture Best Management Practices
   DOF Home     Send Email    DOF Hydrology

Table of Contents

Acknowledgements

Foreword

Special Management Zones

Best Management Practices

Appendices

Glossary

 


• Do not use asphalt or other petroleum based materials.

• Do not construct a hard surface crossing on streams where the bottom is mucky, muddy or otherwise unstable, or if down-stream water quality standards violations occur under normal operating conditions.

• Do not use logs or logging slash as a permanent hard surface crossing material. Logs may be used to facilitate temporary crossings but must be removed from the channel upon completing the operation.

• Keep the height of the surfacing material at a minimum; hard surface crossings must not significantly restrict normal streamflow.

Note: Make sure that crossings are in compliance with other standards and regulations that apply - all types of stream crossings may be subject to permitting by regulatory agencies.

previous page next page
Silviculture Best Management Practices 30