Florida Division of Forestry
Silviculture Best Management Practices
   DOF Home     Send Email    DOF Hydrology

Table of Contents

Acknowledgements

Foreword

Special Management Zones

Best Management Practices

Appendices

Glossary

 

Exception #1:

If the required SMZ area exceeds 10% of the tract area, the SMZ may be reduced (down to 10%) by narrowing the SMZ width.

 Reduced Primary SMZ

 Original Primary SMZ

Appendix 11: Exception 1 Illustration
Appendix 11: Exception 2 Illustration Exception #2:

In areas of existing pine management, the Primary SMZ is not required to be more than 35' wide (50' for OFW, ONRW and Class 1 waters.

 Existing Pine Management Area

Silviculture Best Management Practices 84